Inquiry Basket Inquiry Basket (0) | Recent Visit History | Sign In

Home » Product List » Industrial Wheelie Bins » Garbage Bin Mould (SM-BM-LW)

Product Details

Garbage Bin Mould (SM-BM-LW)

   
Packing:  Strong Wooden Case
Model NO.:  SM-BM-LW
Standard:  Dme, Hasco,ISO9000,90001
Productivity:  100sets/Year
Unit Price:  Negotiable
Shipment Terms:  by Sea or by Air
Payment Terms:  T/T
Minimum Order:  1 Set
Price Valid Time:  From Nov 30,2011 To Jan 29,2012
HS Code:  8480710090
Trademark:  Shiny mould
Origin:  China
Product Material:  Steel
Product:  Garbage Bin Mould
Shaping Mode:  Plastic Injection Mould
Export Markets:  North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Description

Garbage bin mould steel as option:
DIN1.2378 mould steel for core & cavity, made in Germany, HRC35-38;
DIN1.2311 mould steel for core & cavity, made in Germany, HRC29-30;
P20 mould steel for core & cavity, made in China, HRC29-30.

Hot runner partner:
Yudo Hot Runner, Moldmaster (optional)

Injection machine partner:
Hot runner partner:
Yudo Hot Runner, Moldmaster (optional)
Injection machine partner:
Haitian, Sound, Shuangma, Jinde(optional)
Haitian Machinery, Sound Machinery, Chen De Machinery, Borche Machinery, CML machinery, Demag Plastic Group, Yatai Machinery, Soaring Machinery, Hai Yong Machinery, Taifu Machinery.

Procedure of mould assembly and disassembly

Disassembly of Mould
1)Safely lift the mould by crane, 4 lifting points normally. Stand it on the ground cushioned by wooden or rubber.
2)Make transportation bars in mould open position and open the mould in balance.
3)Disassemble the fixation and remove front clamp plate.
4)Take out the hot runner system and protect nozzle tips. Disassemble hot runner plate.
5)Protect cavity plate when staying on the floor.
6)Disassemble hydraulic cylinders with pipes, slides and other components requested.
7)Turn over core slide assembly to place impression surface towards the ground supported by higher frames.
8)Take out all core pins in ejector sleeves and screws on the bottom clamp plate.
9)Unscrew the fixation of lifter rods mounted on the sliders.
10)Disassemble lifters. Be noted that they may fall down when it loses the fixation on sliders, so it may need operators take them by hands and place them on the thick paper to avoid collision.
11)Take away the clamp plate with risers and support pillars and so on.
12)Disassemble ejection plate and take out ejector pins, sleeve and ejection guide pins etc.
13)Take away ejector retainer plate and turn over core plate 900 to take out all inserts.
14)Protect the mould components for the next working procedure. Clean and grease others to avoid rust and put in safe position. Note self-lubrication components can't be greased. Collect all dispersed components in the case.
Assembly of Mould
      Procedure of assembly reverses that of disassembly of the mould.
 
 

(/ )

Gold Member Audited Supplier of Made-in-China.com 3D Demo

"My Showroom" service is provided by Made-in-China.com. Made-in-China.com provides Product Catalog , Manufacturers / Suppliers , Quick Products & Trade Offers.

Quick Products:Plastic Injection Mould Tooling, Plastic Injection Mould Cleaner, Plastic Bin Mould, Plastic Injection Mould Chairs, Injection Plastic Container Mould, Trash Mould Made-in-China.com - The world of "Made in China" online!